126  SITE DEVELOPMENT PLAN REVIEW

 

126.1 PURPOSE: Site development plans are necessary to provide for the efficient and safe use of land, to promote high standards in the layout, design, landscaping, construction and development of land and structures, to minimize surface water drainage problems, to protect adjoining properties from adverse conditions, and, to promote the public health, safety and welfare of the citizens of Madison Township. 

 

Many of our citizens, businesses, and agriculture-businesses are dependent on having an adequate and safe ground water table, when site conditions are favorable and conducive, a bio-retention or comparable system shall be implemented to filter the surface water and to maintain the ground water table nearly at the pre-construction level regarding both qualitatively and quantitatively.  Consultation with and subsequent approval from the Lake County Soil and Water Conservation Districts is strongly recommended for planning these systems.

 

126.2 REQUIREMENT: A site development plan shall be required and shall be submitted for any use or development involving new construction, reconstruction, or expansion of structures in the R-4, R-5, P-1, B-1, B-2, M-1, and S-1 Zoning Districts.  No construction activity shall commence for any such use or project unless and until a site development plan has been submitted according to the requirements as set forth in Section 126.6, paragraph c, and a valid Zoning Certificate has been issued for said project.  Minor construction, reconstruction or alterations which do not affect the purpose of Section 126 shall not be subject to the site plan review process, but shall be subject to submitting all drawings, plans, or other documents as required to obtain a Zoning Certificate.

 

126.3 PREPARATION: Site development plans shall be prepared and certified by an architect, engineer, or land surveyor duly registered by the State of Ohio.  Plans should be prepared at an appropriate scale. 

 

126.4 CONTENTS: Site development plans shall contain the following information:

 

a.  The name of the owner and developer, north arrow, date, and scale;

 

b.  The owners, zoning classification, and present use of adjoining properties;

 

c.  A boundary survey;

 

d.  Existing topography and proposed finished grading with a maximum contour interval of two feet;

 

e.  Locations and dimensions of all existing and proposed structures, off-street parking, fencing, screening, buffers, drives, and walkways;

 

f.   Provisions for adequate control and/or treatment of storm water;

 

g.  All existing and proposed sanitary facilities indicating pipe sizes; types, grades, invert elevations, and location of manholes;

 

h.  All existing and proposed water facilities including line sizes and locations, and hydrant locations;

 

i.   Provisions for adequate storage and removal of solid waste;

 

j.  Applicants must specify the number of, planting size and maximum size of, and location of trees to be planted.  The applicant must specify the number of, planting size and maximum size of, and locations of all shrubs and other flowering or non-flowering plantings to be used.

k.  Applicants must submit proposed building elevations of all sides of the building including the location of all exterior doors and the exterior finishes and/or facades to be used;

l.   Locations and dimensions of all access drives and travel lanes, Adequate areas allowing for delivery and/or emergency vehicles to turn around on site must be provided in the form of a cul-de-sac or comparable design;

 

            m.  All existing and proposed roadway elevations;

           

n   Locations and elevations of adjacent structures;

 

o.  Name, address, and phone number of registered engineer, architect or surveyor and certification of work;

 

p.  All proposed exterior lighting  fixtures to be installed shall be shown on the plan showing the overall illumination level in foot candle power of the site.  Employee parking areas must be illuminated at least until after the last employee has left the site.

 

q.  Minimal access cuts or driveway cuts  are encouraged.  Developments utilizing only one access cut or driveway cut onto a major highway system will be received more favorably by the Commission.  Upon proof of need and with the approval of other governing agencies, approval of multiple cuts/driveways can be requested.

 

126.5 DESIGN STANDARDS:   All site plans shall conform to the following design standards:

 

a.  All proposed water and sanitary improvements shall be designed and constructed in accordance with the standards and requirements of the Lake County Department of Utilities, the Lake County General Health District, and the Ohio Environmental Protection Agency.

 

b.  Every use should be located within 300 feet of a fire hydrant or other water source.  Additional fire hydrants may be recommended by the Madison Fire Chief and shall be located as directed by the Madison Fire Chief,

 

c.  Development features, including building, parking areas, driveways, etc., shall be so located and designed as to minimize adverse impacts on adjacent properties.  Maximum possible visual and auditory privacy for surrounding properties shall be provided through good design and landscaping buffers.

 

d.  Building location and placement shall be developed with consideration given to minimizing the removal of trees and changes of topography,

 

e.  Where located adjacent to residentially zoned property, the required set-back area shall be maintained with natural vegetation and shall have supplemental plantings to provide visual and sound attenuation,

 

f.  Where adjacent to non-residentially zoned property, the maximum lot coverage of building, parking, drives, and other improvements shall be ninety percent (90%).  The remaining ten percent (10%) of the site shall be landscaped with grass and plant material or retained in a natural state with vegetative cover,

 

g.  Parking and service areas shall be screened from view from adjoining residential properties.  Screening of parking and service areas shall be provided by means of landscaping, ornamental walls, fences, or similar means.  Use of slow or low growing deciduous trees of various varieties shall be used on the site.  “Lighting fixtures should be placed to minimize an effect on adjoining properties.”

 

h.  In parking areas designed to accommodate 30 vehicles or more, visual relief shall be provided by means of landscaped dividers and/or islands,

 

i.  Drives, travel lanes, and parking areas shall be designed and related to public thoroughfares to provide for pedestrian and vehicular safety both in the right-of-way and on the site.  On-site circulation shall provide for adequate access by emergency and safety vehicles.  Adequate areas shall be provided for snow removal vehicles and for snow retention.

 

j.  Storm runoff provisions shall be designed based on a minimum one hundred (100) year frequency design storm and the storm drainage calculations submitted with the site plan.  In all cases, the design shall incorporate systems to maintain the ground water table nearly at the pre-construction level.  As the least desirable, the proposed outlet for storm drainage shall be identified and an evaluation made of its capacity to accommodate the projected flows.  Where adequate capacity to handle projected flows does not exist in the existing system, or where there is no acceptable outlet, the applicant shall provide for either improvement of the receiving drainage facility or on-site detention of sufficient capacity and design to reduce post-development storm runoff to pre-development levels for all design storms of one hundred (100) year frequency or less

 

GROUND WATER MAPPING STANDARDS

 

1.       The number of borings shall be sufficient such that no more than 100 ft spacing exists between borings, measured in any direction.  A minimum of 1 boring per lot shall be required.

 

2.      A minimum of one groundwater monitoring well shall be installed within each borehole.  The well shall consist of a ¾ inch or larger slotted PVC pipe that is backfilled to within 1 ft of grade with sand.  The upper 1 ft of the well shall consist of a capped, non-slotted PVC pipe, and the annular space around the solid pipe shall be sealed with bentonite to prevent groundwater from entering the well and affecting groundwater measurements   Follow-up groundwater measurements within the well shall be taken 24 and 72 hrs  after installation. 

 

3.      The United States Geological Survey ground surface elevation at each boring location shall be measured and presented on each boring log.  The following provides the minimum amount of information that must be presented on the boring logs:

 

a.       USGS ground surface elevation.

b.      Date, time, and weather conditions at the time of drilling.

c.       Company that completed the drilling, including company phone number and address.  The driller’s initials must also appear on the boring logs.   

d.      All ground water measurements including follow-up measurements shall be marked as part of this log,

e.       A sketch of the site depicting the exact well locations must be submitted.

 

126.6 APPROVAL PROCESS: 

 

a.  Seven (7) complete sets of copies of the site development and building plans shall be submitted to the Zoning Inspector at least thirty (30) days prior to the requested meeting.  The applicant shall forward one (1) complete set of plans to the Madison Fire Department requesting written comments.

 

b.  The Zoning Inspector shall review site development plans for compliance with the provisions of the Zoning Resolution and this Section.  The Zoning Inspector may forward said site development plans to an independent engineer if additional review is needed.  Said engineer shall review same for conformity to the proper relation with existing or proposed sanitary sewers, water lines, storm drainage, and existing grades of adjacent lands and structures.  The cost of such engineer’s review shall be borne by the applicant and shall be in addition to such other fees as may from time to time be established by the Trustees for processing and review of site plans.

 

c.  After review and approval by the Zoning Inspector and, if needed, the Engineer the site development plans shall be reviewed by the Board of Zoning Commission.  An approval from the Board shall consist of 3 affirmative votes.  If approved by the Board of Zoning Commission, the signature of the Zoning Inspector shall be placed on the site development plans and compliance with said plans shall become a condition of the Zoning Certificate which may be issued for such development.

 

d.  Correspondence from the Lake County Department of Utilities that sufficient water and sanitary system capacity exists to accommodate the proposed development shall be required. If an on-site sewage disposal system is proposed, correspondence from the Lake County General Health District /Ohio EPA that appropriate soils and land area for such system exist on the site shall be required.                                         

 

          e.  Approval of the site plan shall be contingent upon the applicant receiving written approval from the Lake County Soil and Water Conservation District, the Lake County Engineer, the Lake County General Health District, the approval of the Lake County Storm Water Management Engineer, the Ohio Environmental Protection Agency the Lake County Utilities Department, the Madison Fire District, and all other applicable governing agencies.  Copies of said written approval shall be presented to the Zoning Officer.

 

            f.  Any deviances or alterations from the site plan submitted and approved by the Madison Township Zoning Commission is prohibited.  Upon determination that alterations to the approved plan are necessary, the applicant shall immediately notify the Zoning Inspector who shall make a determination whether or not the applicant shall resubmit the site plan to the Zoning Commission for the pu4rpose of amending approval.  The Zoning Inspector shall apply the criteria found within Section 126.2 to determine if the Commission’s re-approval is required.

 

126.7 APPEAL OF APPROVED PLAN: The approval of the Zoning Commission and the signature of the Zoning Inspector are final and may not be appealed to the Board of Zoning Appeals and no variances there from may be granted by the Board of Zoning Appeals.  The Site Development Plan Review process is not subject to review by, or the granting of exceptions or variances by the Board of Zoning Appeals.